
OpEx Power Savings: Stop Bleeding Money on Excess Pressure
Pipelines often pump higher than needed, then bleed pressure at the destination — wasted energy spend. Lean closed-loop profiles cut power cost while still meeting contracted volumes.
Most lines run “safe-high” pressure so operators can guarantee delivery under uncertainty. That margin becomes kWh you pay for — and then dissipate. Closed-loop control holds leaner profiles that still hit nominations, lowering energy per barrel on existing pumps and SCADA.
Results highlighted in the one-pager
- Up to 16% power cost reduction
- Lean pressure profiles with lower energy per barrel
- Contracted volumes still met — lean pressure ≠ less delivery
- No CapEx required — deploys on existing infrastructure
Share this resource
Suggested reads
Industrial Automation Hub: Deploy Control Systems Faster with Agentic AI
See how IAH accelerates deployment, maintenance, and scaling of control applications across your pipeline network — cutting time to value by about 50% per pipeline.
View download →Asset Integrity: Extend Pipeline Life by Reducing Pressure Swings
Rapid pressure swings from manual control create fatigue cycles that accelerate stress cracking, leaks, and premature replacement. Smoother automation defers multi-year CapEx.
View download →OpEx DRA Savings: Eliminate Waste from Manual Injection
Manual drag-reducing-agent dosing over-injects, under-injects, or mistimes injection — wasting chemical spend and risking off-spec product. Precision automation recovers that cost.
View download →